Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Critical path method")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 233

  • Page / 10
Export

Selection :

  • and

A note on activity floats in activity-on-arrow networksZHAO, T; TSENG, C-L.The Journal of the Operational Research Society. 2003, Vol 54, Num 12, pp 1296-1299, issn 0160-5682, 4 p.Article

Criticism of CPM for projet planning analysis = Critique de l'utilisation de la méthode du chemin critique dans la planification d'un projetJAAFARI, A.Journal of construction engineering and management. 1984, Vol 110, Num 2, pp 222-233, issn 0733-9364Article

Unified activity network model = Modèle unifié de réseau d'activitéHENDRICKSON, C; ZOZAYA-GOROSTIZA, C.Journal of computing in civil engineering. 1989, Vol 3, Num 2, pp 192-200, issn 0887-3801Article

Simulating Construction Duration for Multistory Buildings with Controlling ActivitiesNGUYEN, Long D; PHAN, Duc H; TANG, Llewellyn C. M et al.Journal of construction engineering and management. 2013, Vol 139, Num 8, pp 951-959, issn 0733-9364, 9 p.Article

Critical path identification in planning of winery wastewater plantSEMRA SIBER ULUATAM; IBRAHIM VOLKAN BODUR.International journal of environmental studies. 1993, Vol 43, Num 1, pp 39-49, issn 0020-7233Article

Monitoring concrete pavement construction project by CPM technique = Contrôle du projet de construction de chaussée en béton par la technique du CPMJOSHI, L. S.Journal of the Institution of Engineers. India. Civil Engineering Division. 1984, Vol 64, pp 201-207, issn 0020-336X, 4Article

A CPM analysis of microbiology computerization project for hospital management information processingKWAK, N. K; LONG, D. A; SCHNIEDERJANS, M. J et al.Information processing & management. 1985, Vol 21, Num 2, pp 149-155, issn 0306-4573Article

Consultants' Perceptions on Construction Delay Analysis MethodologiesBRAIMAH, Nuhu; NDEKUGRI, Issaka.Journal of construction engineering and management. 2009, Vol 135, Num 12, pp 1279-1288, issn 0733-9364, 10 p.Article

Transform Schemes Applied on Non-Finish-to-Start Logical Relationships in Project Network DiagramsMING LU; LAM, Hoi-Ching.Journal of construction engineering and management. 2009, Vol 135, Num 9, pp 863-873, issn 0733-9364, 11 p.Article

Evaluation of the resource-constrained critical path method algorithmsKIM, Kyunghwan; DE LA GARZA, Jesus M.Journal of construction engineering and management. 2005, Vol 131, Num 5, pp 522-532, issn 0733-9364, 11 p.Article

Resource-activity critical-path method for construction planningMING LU; HENG LI.Journal of construction engineering and management. 2003, Vol 129, Num 4, pp 412-420, issn 0733-9364, 9 p.Article

Critical Path Segments Scheduling TechniqueHEGAZY, Tarek; MENESI, Wail.Journal of construction engineering and management. 2010, Vol 136, Num 10, pp 1078-1085, issn 0733-9364, 8 p.Article

Models for accurate computation of earliest and latest start times and optimal compression in project networksMOUSSOURAKIS, John; HAKSEVER, Cengiz.Journal of construction engineering and management. 2007, Vol 133, Num 8, pp 600-608, issn 0733-9364, 9 p.Article

Critical space analysisWINCH, Graham M; NORTH, Steve.Journal of construction engineering and management. 2006, Vol 132, Num 5, pp 473-481, issn 0733-9364, 9 p.Article

Critical Path Scheduling under Resource Calendar ConstraintsMING LU; LAM, Hoi-Ching.Journal of construction engineering and management. 2008, Vol 134, Num 1, pp 25-31, issn 0733-9364, 7 p.Article

Linear versus network scheduling : A critical path comparisonKALLANTZIS, Alexandros; SOLDATOS, John; LAMBROPOULOS, Sergios et al.Journal of construction engineering and management. 2007, Vol 133, Num 7, pp 483-491, issn 0733-9364, 9 p.Article

Flexible model for time/cost tradeoff problemMOUSSOURAKIS, John; HAKSEVER, Cengiz.Journal of construction engineering and management. 2004, Vol 130, Num 3, pp 307-314, issn 0733-9364, 8 p.Article

Work continuity constraints in project schedulingVANHOUCKE, Mario.Journal of construction engineering and management. 2005, Vol 132, Num 1, pp 14-25, issn 0733-9364, 12 p.Article

Key constraints analysis with integrated production schedulerCHUA, D. K. H; SHEN, L. J.Journal of construction engineering and management. 2005, Vol 131, Num 7, pp 753-764, issn 0733-9364, 12 p.Article

Binary resource leveling model: Activity splitting allowedSON, Jaeho; MATTILA, Kris G.Journal of construction engineering and management. 2004, Vol 130, Num 6, pp 887-894, issn 0733-9364, 8 p.Article

TECHNIQUES TO IMPROVE POWER PLANT PRODUCTIVITYSHURTZ S.1978; AMERICAN POWER CONFERENCE/1978/CHICAGO; USA; DA. 1978; 13 P.Conference Paper

CRITICAL PATH ANALYSIS IN PROJECT MANAGEMENT = ANALYSE PAR LA METHODE DU CHEMIN CRITIQUE DANS LA GESTION DE PROJETSRINIVAS PRASAD HS.1980; J. INST. ENG., INDIA, CIV. ENG. DIV.; ISSN 0373-1995; IND; DA. 1980; VOL. 60; NO 5; PP. 271-275; BIBL. 5 REF.Article

Critical path analysis and resource constrained project scheduling. Theory and practiceWILLIS, R. J.European journal of operational research. 1985, Vol 21, Num 2, pp 149-155, issn 0377-2217Article

Standardizing scheduling data exchangeEAST, E. W; KIM, S.Journal of construction engineering and management. 1993, Vol 119, Num 2, pp 215-225, issn 0733-9364Article

The application of critical path methodology to the management of ship design programsCHAPPELL, J. P.Marine technology. 1991, Vol 28, Num 3, pp 113-128, issn 0025-3316Article